BOD2
[commercial]construction · food-service · 1 deployments in catalog
Manufacturer
COBODForm Factor
construction
Lifecycle
commercial
Operational Reality
Audited
Deployments
1
Target Price
Custom Quote
- COMMERCIAL
Description
COBOD's BOD2 is a gantry-based 3D construction printer that extrudes concrete layer by layer to build wall structures on site; the modular gantry scales to different building sizes. The newer BOD3 adds a ground-track for continuous linear printing of multiple buildings.
Key facts & specs
- website
- https://cobod.com/solution/bod2/
- maturity
- commercial
- lifecycle
- active
- form factor
- construction
- manufacturer
- COBOD
- deployments count
- 1
- Maturity stage
- commercial
- Class
- gantry 3D construction printer
- Method
- concrete layer extrusion
- Max speed
- 1000 mm/s
- Weight kg
- 5390
- Robot
- Gantry-based BOD2 and BOD3 3D construction printers
- Focus
- 3D construction-printing technology for building structures layer by layer
- Scale
- Used by builders in 35-plus countries
- Backers
- Backed by GE, CEMEX, and Holcim
- Countries deployed
- 35+
Safety record
No incidents on record for BOD2.
FAQ
What is BOD2?
COBOD's BOD2 is a gantry-based 3D construction printer that extrudes concrete layer by layer to build wall structures on site; the modular gantry scales to different building sizes. The newer BOD3 adds a ground-track for continuous linear printing of multiple buildings.
Is BOD2 actually deployed in the real world?
Yes. BOD2 is independently verified in real-world operation on the DEPLOY registry, confirmed at named deployment sites with primary sources: not a concept, render, or demo-only.
What are the specs of BOD2?
BOD2's recorded specifications on the DEPLOY registry: Max speed: 1000 mm/s; Weight: 5390 kg. See the Specs section for the full sourced set.
Who makes BOD2?
BOD2 is made by COBOD, based in Copenhagen, Denmark, founded in 2015.
Where is BOD2 deployed?
1 verified deployment of BOD2 is on the DEPLOY registry, including at Tempe.
Can you buy BOD2?
BOD2 is in commercial deployment and is sold to operators; contact the manufacturer to buy, and see the pricing section for any recorded price.
What are alternatives to BOD2?
On the DEPLOY registry, comparable construction robots to BOD2 include Brokk 170, Exosystem, Maximo, Apis Cor Mobile Printer.
How does BOD2 compare to Brokk 170?
BOD2 and Brokk 170 (Brokk · 5 deployments) are both construction robots on the DEPLOY registry. BOD2 has 1 verified deployment on record. Compare both records for specs, safety, deployments, and verified-vs-claimed autonomy.
Is BOD2 a top construction?
On DEPLOY's intelligence score, which blends verified deployments, safety, adoption, media, and IP signals, BOD2 ranks in roughly the top 39% of construction models tracked by the registry.
What is BOD2's maturity stage?
BOD2 is at the commercial stage on the DEPLOY maturity ladder (research, prototype, pilot, commercial, production). Commercial stage means production-grade deployments are operating at named customer sites.
Is BOD2 safe?
BOD2 has no incidents on record in the DEPLOY registry. This does not constitute a safety guarantee; it reflects the incidents DEPLOY has tracked and verified to date.
What is the COBOD BOD2 construction robot?
The COBOD BOD2 is the world's most used concrete 3D printer, a high-precision gantry system for printing buildings up to three stories. Ideal for custom homes and multi-unit residential. COBOD also introduced a multifunctional construction robot that can 3D print concrete and perform additional tasks via a vertical telescopic arm.