COMMERCIAL OPERATION RECORD
Elios 3 at Lausanne
OPERATIONALVERIFIED DEPLOYMENT
Jun 1, 2024
Commenced
2
Sectors
GEOCODED
Coordinates
Operational Footprint
PRECISION: verified_coordinates
LausanneLAT: 46.5197 / LON: 6.6323
Operational Parameters
Deployment IDflyability-power-plant-europe
Fleet OperatorFlyability
LocationLausanne
Operational DateJun 1, 2024
Current StatusOPERATIONAL
Classified Sectors