OSHA: Hospitalization involving Industrial Robot / Workcell at Cerro Wire LLC (HARTSELLE, ALABAMA, USA)
[WORKPLACE INJURY]Mar 30, 2023 · Physical AI Entity · Industrial Robot / Workcell · HARTSELLE, ALABAMA, USA
Failure Mode
WORKPLACE INJURY
Event Date
Mar 30, 2023
Primary Entity
Physical AI Entity
Robotic Platform
Industrial Robot / Workcell
Jurisdiction / Location
HARTSELLE, ALABAMA, USA
Audit Standard
Physical State Verified
Incident Abstract & Audit Findings
An employee was operating a palletizer. While attempting to reposition wire coil from a robotic stacker, the stacker engaged and pinned her against the metal guard opening of the palletizer. She suffered pneumothorax, a pulmonary contusion, and a rib fracture.
System & Fleet Architecture
Operating Manufacturer
Hardware Platform
Operational Sectors
Primary Sources & Evidentiary Filings
- Inspect Filing
US OSHA Severe Injury Reports (29 CFR 1904.39)
https://www.osha.gov/severe-injury-reports
Incident Context & FAQ
What happened in this OSHA incident at Cerro Wire LLC?
An employee was operating a palletizer. While attempting to reposition wire coil from a robotic stacker, the stacker engaged and pinned her against the metal guard opening of the palletizer. She suffered pneumothorax, a pulmonary contusion, and a rib fracture.
What injuries occurred in this incident at Cerro Wire LLC?
The incident resulted in 1 hospitalization(s) and 0 amputation(s). Official determination: Hospitalization.